19 August 2018

19th of August

Farm status
Intel GPUs
2 x i7-8700 doing Asteroids and Seti work

Nvidia GPUs
2 x Ryzen 1700 doing Asteriods and Seti

Marks Rpi Cluster
All doing Einstein BRP4 work


Other news
Einstein discovered an issue with the preparation of the data for the gravity wave search. They think there may be an issue with the de-jittering they apply before we crunch the work units. The current search is about 75% completed. I have stopped running Einstein gravity wave work while the project determine what to do next.

No comments: